If You Have These 2 Constraints 6r 4d 180 000 Machine Hour Constraint 3r 5d 150
If you have these 2 constraints:
0.6R+4D £ 180,000 Machine Hour constraint
3R+5D £ 150,000 Direct Labor Hour constraint
Required:
a Draw a graph showing the possible production plans for this company.
b- From your opinion where is the feasible area of the production plan. Explain your answer.
Answer: